Page 48 - koreatechnics
P. 48
FXD 8×D
DRILLING
● Shank ISO9766, Parallel with clamping flat
Code No. 치수 Dimension(mm) B 인서트 Insert Torx 센터드릴
D L1 L Ds Ls Insert Screw Screw Pilot Drill
FXD-18080D S25 18.0 149 235 SPMX TSB-
FXD-18580D S25 18.5 153 239 050204 20045
FXD-19080D S25 19.0 157 243
FXD-19580D S25 19.5 161 247 25 56 PT-1/8 TXL-6 PLD-0620
FXD-20080D S25 20.0 165 251 32 TiN
FXD-20580D S25 20.5 169 255 SPMX TSB-
FXD-21080D S25 21.0 173 259 060204 22052
FXD-21580D S25 21.5 177 263
FXD-22080D S25 22.0 181 267 60 PT-1/4 SPMX TSB- TXL-8 PLD-0825
FXD-22580D S25 22.5 185 271 07T308 25065 TiN
FXD-23080D S25 23.0 189 275
FXD-23580D S25 23.5 193 279
FXD-24080D S25 24.0 197 283
FXD-24580D S25 24.5 201 287
FXD-25080D S25 25.0 205 291
FXD-25580D S32
FXD-26080D S32 25.5 209 304
FXD-26580D S32 26.0 213 308
FXD-27080D S32 26.5 217 312
FXD-27580D S32 27.0 221 316
FXD-28080D S32 27.5 225 320
FXD-28580D S32 28.0 229 324
FXD-29080D S32 28.5 233 328
FXD-29580D S32 29.0 237 332
FXD-30080D S32 29.5 241 336
30.0 245 340
※ FXD DRILL은 겹판가공이 가능합니다. 관통작업시 이송을 30~50%정도 줄여서 작업해주세요.
※ SPMX 인서트는 108페이지를 참조해주세요
※ FXD DRILL is capable of working laminated boards. Please reduce the feed rate by 30%~50% when performing penetration work.
※ Please refer to the page108 regarding SPMX insert.
▣ 조립순서 ▣ FXD Setting View
1. ①PLD를 홀에 삽입한다. ③ Cone point Set Screw
2. ④인서트(2pcs.)를 체결한다. -PLD Adjust & Remove
3. ③번 스크류로 PLD높이를 조절한다.
4. ②번 스크류로 강하게 클램핑한다. ② Clamping Screw For PLD
5. PLD와③번 스크류 사이에 유격이 발생하지 않도록 꽉 조여준다.
④ Insert
▣ How to set the clamping (SPMG)
1. The ①PLD insert to Hole.. ① PLD
2. Locking the ④Insert.(2pcs.) (Center Drill)
3. The PLD Hight control as the ③Screw.
4. Clamping ②Screw tightiy
5. Do not make a space between
PLD and ③Screw so you must be tight.
46 www.koreatechnics.com